Control-system engineering
Technical work begins with the system architecture, technical evidence and the exact reliability objective.
Mark V / Mark VI / Mark VIe / Mark VIeS architecture and configuration
Establish the controller, I/O, network, software and project baseline before diagnosing a fault or designing any modification.
Control logic review, optimization and modification
Trace permissives, sequencing, alarms and protection paths against the operating objective; document each approved change and its rollback point.
Grounding and communication-path improvement
Locate field-circuit, grounding and network fault boundaries from measured evidence before defining corrective work and return-to-service checks.
I/O mapping, signal-path and compatibility analysis
Follow a field signal through terminal boards, I/O packs, controller logic, networks and the HMI to confirm the actual fault boundary.
HMI, historian and control-network modernization
Preserve project data, EGD definitions, accounts, licenses, time sources and a tested fallback while replacing aging operator-layer equipment.
Site-specific implementation and test planning
Translate the engineering scope into wiring, configuration, loop-check, FAT, SAT and acceptance records suitable for controlled outage execution.